Austin

Austin

Austin is a compact loft-over-garage cabin that punches above its size. You get a 650 sq ft, 1 bedroom, 1 bath layout over a 2-car garage, complete with a full kitchen and a real living room, not just a bunk space. Add an exterior stair for a private guest or ADU-style entry where allowed. Keep one bay open for vehicles and turn the other into a workbench and storage zone with the outlets you need. The panelized kit goes up fast to a lockable shell so you can start finishing sooner, whether you want a weekend cabin, a backyard apartment, or a flexible studio over the garage.

FAQs:

Yes. The Camino is a 994 sq ft, 1-bedroom prefab panelized home kit that aligns with many ADU programs. Confirm local zoning, setbacks, height, parking, utilities, and design rules before you order.

FAQs:

Yes. Choose lap, panel, or stucco siding and code-approved roof materials. Pitch and eave details may be adjustable with engineering.

FAQs:

Yes. Bedroom 3 can be used as a flex space such as a home office or nursery. During plan review you can request outlet placement, a data drop, or built-ins, subject to engineering and local code.

FAQs:

Screening is a common add-on on plans with a covered porch. Extending the porch or changing posts, beams, or roof ties may require engineering and must meet local code.

FAQs:

Often yes. The plan includes a formal dining room; during plan review you can request converting it to a study or opening walls to the kitchen, subject to engineering and local code.

FAQs:

Often yes. The plan can be mirrored so the primary suite swaps sides with the family bedrooms, subject to engineering and local code.

FAQs:

Yes. Riverbend can be engineered for your jurisdiction’s code set (for example, IECC or Title 24). In designated WUI areas, required measures are addressed during plan review.

FAQs:

Yes. The front bedroom can be used as a den or office. During plan review you can request items like a data drop, added outlets, or built-ins, subject to engineering and local code.

FAQs:

Yes. Storage alcoves, workbench space, and outlet locations can be planned during review without changing the 3-bay count, subject to engineering and local code.

FAQs:

Newport is planned for accessibility with step-less entry and 36-inch doors and hallways. Additional accessibility options can be reviewed during plan customization, subject to engineering and local code.

FAQs:

Often yes. The compact 1-bedroom footprint is suitable for many ADU programs; confirm local zoning, setbacks, parking, and utility rules for your lot.

FAQs:

Yes. Sonoma’s 1-bedroom, 1-bathroom design makes it ideal for an ADU, guest house, or backyard cottage. Confirm local zoning, setbacks, parking, and utility rules before proceeding.

FAQs:

Yes. Keep the alcove as shown or convert the space to cabinetry or a media niche; clearances and vent routing are verified during plan review.

FAQs:

Typically an egress window of compliant size, minimum natural light and ventilation, and a closet solution. Exact requirements vary by jurisdiction.

FAQs:

Often feasible with added foundation support and insulated glazing; spans and loads are verified in the drawings.

FAQs:

Most projects reach a lockable shell in about 5 to 7 days because factory-numbered wall panels and trusses speed onsite work. Actual timing varies by crew, site, and weather.

FAQs:

Yes. Wider cased openings or a half wall are common; structure is checked in drawings.

FAQs:

Plan for about 6 to 8 days to reach a lockable shell. Numbered wall panels and roof trusses speed onsite work; crew, site, and weather affect timing.

FAQs:

Plan for about 6 to 8 days to reach a lockable shell. Numbered wall panels and roof trusses speed onsite work; timing varies by crew, site, and weather.

FAQs:

Plan for about 6 to 8 days. Numbered wall panels and roof trusses speed onsite work; timing varies by crew, site, and weather.

FAQs:

Plan for about 6 to 8 days. Numbered wall panels and roof trusses speed onsite work; timing varies by crew, site, and weather.

FAQs:

Yes. Owners often extend the corner porch for seating or add screening; posts, beams, and footings are sized during drafting.

FAQs:

Plan for about 6 to 8 days. Numbered wall panels and roof trusses speed onsite work; timing varies by crew, site, and weather.

FAQs:

Yes. Popular adds are solid-core doors, acoustic insulation in interior walls, and low-noise ventilation. One of Murrieta’s three private suites is typically repurposed for office use.

FAQs:

Plan for about 6 to 9 days. Numbered wall panels and roof trusses speed onsite work; timing varies by crew, site, and weather.

FAQs:

About 7 to 10 days in typical conditions. Crews stand the numbered wall panels, set trusses, sheath the roof and walls, then wrap and secure openings so trades can start.

FAQs:

Often possible. Popular options include a wider cased opening or removing a section of wall while keeping circulation to the kitchen and porch entries.

FAQs:

About 5 to 7 days. Compact footprint with one crane day for trusses speeds dry-in.

FAQs:

About 6 to 8 days. Wrap-around porch beams and posts add setup time.

FAQs:

About 6 to 8 days. Bonus room over the garage may need an extra truss lift.

FAQs:

About 6 to 8 days. Half-bay garage and more interior partitions add staging.

FAQs:

About 6 to 9 days. Dual porches and first-floor suite rooflines add sequencing steps.

FAQs:

About 6 to 8 days. Porch plus mixed formal and informal walls require extra layout checks.

FAQs:

About 6 to 8 days. Two-story living room height and clerestory glazing extend bracing time.

FAQs:

About 7 to 10 days. Larger footprint and bonus-over-garage increase truss and sheathing time.

FAQs:

About 3 to 5 days. Porch extensions or sloped sites can add time.

FAQs:

About 6 to 8 days in typical conditions. Crew size, inspections, site, and weather affect timing.

FAQs:

About 3 to 5 days, depending on crew, site, inspections, and weather.

FAQs:

About 2 to 4 days. Taller walls or upsized door headers can extend framing.

FAQs:

About 2 to 4 days. Taller walls or upsized door headers can extend framing.

FAQs:

About 3 to 5 days, depending on crew, site, inspections, and weather. Panelized loft walls, engineered trusses, and precut rafters speed framing.

FAQs:

About 3 to 5 days. Porch extensions or sloped sites can add time

FAQs:

Prefab barns and garages usually come at a lower cost compared to traditionally built barns and garages. In addition, prefab barns and garages take less time to build compared to traditionally built barns or garages.

Panelized Kit Home Specs:

  • Total Living Space: 650 ft² (60 m²)
  • Bedrooms: 1
  • Bathrooms: 1
  • Garage: 2 Car
  • Ceiling Height: 8’
  • Covered Porch: N/A
  • Home Plan Cost: Included
  • Building Kit Cost: $73,765
  • Style: 2 Story
  • Minimum Payment: $3,900
Download Free Plan Review Set

Want More Information?

Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input

Add to Cart

Contact Us

We will contact you and draw up requirements for the project and estimate.
Please enter your first name
Please enter your last name
Please enter a valid email address
Invalid Input